Background
Type: Article

JUST-IN-TIME SCHEDULING IN IDENTICAL PARALLEL MACHINE SEQUENCE-DEPENDENT GROUP SCHEDULING PROBLEM

Journal: Journal of Industrial and Management Optimization (15475816)Year: November 2022Volume: 18Issue: Pages: 3807 - 3830
Goli A.a Keshavarz T.
GoldDOI:10.3934/jimo.2021124Language: English

Abstract

In this research, a parallel machine sequence-dependent group scheduling problem with the goal of minimizing total weighted earliness and tardiness is investigated. First, a mathematical model is developed for the research problem which can be used for solving small-sized instances. Since the problem is shown to be NP-hard, this research focuses on proposing metaheuristic algorithms for finding near-optimal solutions. In this regard, the main contribution of this research is to apply the Biogeography-based Optimization (BBO) algorithm as a novel meta-heuristic and Variable Neighborhood Search (VNS) algorithm as a best-known one. In order to evaluate the mathematical model and solution methods, several computational experiments are conducted. The computational experiments demonstrate the efficiency of the proposed meta-heuristic algorithms in terms of speed and solution quality. The maximum gap of BBO algorithm is 1.04% and for VNS algorithm, it is 1.35%. © 2022, Journal of Industrial and Management Optimization. All rights reserved.


Author Keywords

Biogeography-based optimizationEarliness and tardiness penaltiesParallel machinesSequence-dependent group schedulingVariable neighborhood search

Other Keywords

Computational efficiencyEcologyOptimizationSchedulingBiogeography-based optimization algorithmsBiogeography-based optimizationsEarliness and tardiness penaltiesGroup schedulingMeta-heuristics algorithmsParallel machineScheduling problemSequence-dependentSequence-dependent group schedulingVariable neighborhood searchHeuristic algorithms