Background
Type: Book Chapter

Multi-objective aggregate production planning model considering overtime and outsourcing options under fuzzy seasonal demand

Journal: Lecture Notes in Mechanical Engineering (21954356)Year: 2019Volume: Issue: Pages: 81 - 96
Tirkolaee E.B.Goli A.a Weber G.-W.
DOI:10.1007/978-3-030-18789-7_8Language: English

Abstract

This paper investigates a novel fuzzy multi-objective multi-period Aggregate Production Planning (APP) problem under seasonal demand. As two of the main real-world assumptions, the options of workforce overtime and outsourcing are studied in the proposed Mixed-Integer Linear Programming (MILP) model. The main goals are to minimize the total cost including in-house production, outsourcing, workforce, holding, shortage and employment/unemployment costs, and maximize the customers’ satisfaction level. To deal with demand uncertainty, triangular fuzzy numbers are considered for demand parameters. Then the proposed model is validated by solving an illustrative example using a Weighted Goal Programming (WGP) method and CPLEX solver. Finally, it is demonstrated that uncertain conditions and considering real-world assumptions can yield different results in developing a practical aggregate production plan. Moreover, a sensitivity analysis is then performed to provide qualitative managerial insights and decision aids. © Springer Nature Switzerland AG 2019.


Author Keywords

Aggregate production planningFuzzy seasonal demandOutsourcingSensitivity analysisWeighted Goal Programming

Other Keywords

AggregatesCustomer satisfactionDecision makingDecision support systemsFuzzy setsInteger programmingOutsourcingPlanningProduction controlSensitivity analysisAggregate production planningFuzzy seasonal demandGoal-programmingMulti objectiveMulti-periodPlanning modelsPlanning problemReal-worldSeasonal demandsWeighted goal programmingGoal programming